国产欧美日本-久久伊人久久-95视频在线观看-性生活在线视频-波多野结衣家庭主妇-国内av网站-hs视频在线观看-国产日韩欧美二区-国产免费一区二区三区网站免费-亚洲国产精品午夜在线观看-97久久国产亚洲精品超碰热

Mine Engineering

Mine Engineering

Home > SERVICES > Engineering Solution > Mine Engineering

Chambishi Copper Mine in Zambia
DATE:15 Nov 2017 瀏覽次數:1
+ . -

The project is in Copperbelt Province in the north of Zambia, and copper sources are mainly the main orebody, west orebody and southeast orebody. It went into production on July 28, 2003 (including graded tailings filling system). The west orebody has went into production at the end of 2012 (including paste filling system).

The design capacity of the main ore body is 6,500 t/d. Medium-length hole sublevel open stoping with backfilling and upward horizontal cut-and-fill stoping method, shaft development and full-automatic hoisting system are adopted. 10m3 side-bottom dumping car independently designed by ENFI is used for level haulage. The design capacity of the west orebody is 3,000 t/d, point-pillar backfilling and upward horizontal cut-and-fill stoping method are used. Combined trackless ramp and central auxiliary shaft development is used.

The design capacity of the concentrator is 6,500 t/d. Three-stage crushing with one closed circuit process, one-stage roughing, two-stage scavenging, one-stage cleaning and middlings regrinding process, and two-stage dewatering of thickening - filtering for copper concentrate are adopted.